Decisions - a ruling from you
6 open2 shipped todayYou walked all 15 solution pages by voice and logged ~40 design corrections (17 systemic patterns plus per-page fixes). Vale turned them into module-first specs and the build is packaged as bus command c0046, ready to fire. One word starts it, DG-Robin builds on the laptop against staging, and nothing reaches prod without you.
The callFire c0046 to build the v2 rework now, or hold?
▶ Recommendation: Option A (Go now). Confidence 90%
What would change itIf a c0046 spec decision is still unratified and you want to weigh in first, hold until that one point is settled.
The WorkJam ROI materials cite customer outcome numbers. Several were caught as wrong (Ulta was 7x overstated, an M&S quote was invented, Panda and Venetian and a 3-6x claim flagged unverified) and either fixed or flagged. Publishing an unverifiable client stat is a reputation and legal risk that already bit us once, so the bar before these leave the internal review surface matters.
The callWhat is the clearance bar before these stats go anywhere public?
▶ Recommendation: Option B (Soften to defensible ranges now). Confidence 75%
What would change itIf WorkJam can hand over sourced figures quickly, switch to A and keep the hard numbers.
The Innoova workspace is centralized in a private repo (github.com/YassSoliman/innoova-workspace), scrubbed of secrets on creation. Anass is your Innoova collaborator. Adding him is a GitHub invite, gated on your go per the standing rule that repo access is your call.
The callSend Anass the collaborator invite to innoova-workspace now?
▶ Recommendation: Option A (Invite now). Confidence 80%
What would change itIf any unscrubbed secret or client-confidential file might still be in history, hold and re-scrub first.
Next up - 2 more decision(s)
The DataGrail lawsuit and regulatory feed runs on an LLM extraction engine. Sonnet-5 is now available, cheaper and faster for this deterministic extraction work. This is a standing ruling to confirm the switch as the default going forward.
The callMake Sonnet-5 the default engine for the DG feed?
▶ Recommendation: Option A (Switch to Sonnet-5). Confidence 85%
What would change itIf Sonnet-5 misses items the current engine catches on a sample run, stay put.
The DataGrail regulatory feed pulls FTC actions. Showing everything is noisy, curating to the six most relevant items per cycle keeps the feed sharp for Kendall's review. This is a standing ruling to adopt the six-item curation.
The callAdopt six-item FTC curation as the default?
▶ Recommendation: Option A (Curate to six). Confidence 80%
What would change itIf six regularly drops items Kendall needs, raise the cap.
Approvals & QA
27 pendingComment drafts
2Asana task ONE-TAP SEND
🎩 [RQ-548453] Before we scope the Asana badge on the landing pages, three quick questions: 1. Which landing pages should carry the badge — every connector/integration LP, or a specific set (e.g. the Asana connector page only)? 2. Which badge + variant — the official "Works with Asana" / Asana partner badge? If so, do you have the approved artwork, or should we pull it from Asana's brand kit? 3. Placement and behavior — hero, footer, or a trust-strip; static image or linked to your Asana app-directory listing? — Just reply in a comment; numbered answers help us move fastest.paste on the card, then hit Done here (or tell Alfred you sent it); the draft file is deleted on post
Notion page ONE-TAP SEND
=== INTERNAL (Yasser review — not client-visible) ===
CORRECTION: the 08:50 sweep skipped this as a pinned 📌 template. It is NOT a template —
Marjorie duplicated the pinned model and filled it with a real request (📌 icon carried
over from the copy). Genuine Innoova Triage card; she edited it 3x (08:45→08:57→09:02),
this draft reflects the FINAL content.
Board: Innoova — Tâches (collection://a923ef53-93f2-4294-af02-fd023443ff12).
Requester: Marjorie. Domaine: Gestion de projet. Priorité: Moyenne.
Échéance souhaitée: 21 juillet 2026. Status: Triage.
SIGNAL (verbatim, from her call w/ Yasser) — TWO blockers, both = "help me build a
business case so I can get STÉPHANE's spend approval":
1) ZOHO RECRUIT: "faire un case ROI pour faire valider l'achat d'une nouvelle licence
sinon il faudra faire l'exercice de rotation de user entre vous et Kurtis (pas idéal)."
→ Build a ROI/business case to justify a NEW dedicated license; fallback = Yasser↔Kurtis
user-rotation (she flags as not ideal).
2) PANDADOC: "nous devons notamment faire un case ROI ou si vous pouvez suggérer un autre
prestataire ... pour faire appro ... à Stéphan." → Build a ROI/business case for PandaDoc,
OR recommend an alternative e-sig provider (PandaDoc vs DocuSign vs other), to get
Stéphane's approval. Type field: "Zoho Recruit, Make et Pandadoc vs DocuSign ou autres
prestataires de signatures électroniques."
READ: this is DELIVERABLE work we can largely produce, not a client-clarification. Two
candidate Unplanned tasks:
A. ROI/business case — dedicated Zoho Recruit license (vs Yasser↔Kurtis rotation).
B. ROI/business case for PandaDoc + comparison/recommendation of alternative e-sig
providers (DocuSign, etc.) — Zoho/Make integration, cost, Loi 25 — for Stéphane approval.
NOT A DUPLICATE, but link on enrichment:
- T-0132 (waiting) — access asks incl. Zoho Recruit seat for service1@innoova.ca.
(Note the tension: the automation needs a MACHINE seat; rotation conflicts with that —
a point FOR the dedicated-license ROI case.)
- T-0133 (backlog) — "Accès équipe SDI" Zoho Recruit/PandaDoc/CRM logins.
- T-0062 — recruitment-automation implementation plan (Zoho Recruit REST, Option A).
- T-0095 epic #4 "Zoho PandaDoc" (offer letters) — the e-sig flow task B would re-decide.
This card adds NEW dimensions over the access threads: license COST/ROI + e-sig vendor
re-evaluation, both framed as Stéphane-approval business cases.
WHY ZERO [RQ] TO CLIENT: card is complete (what/why, type, where, priority, deadline).
Nothing survives to ask her.
>>> YASSER DECISIONS (scope/authority — surface, don't guess):
D1. Take on both ROI/business-case deliverables (A + B), or one, or push back on scope?
(Recommend yes — low effort, high client-trust, directly unblocks the automation we're
already building; the Zoho case doubles as the argument for the machine seat T-0132 needs.)
D2. E-sig direction to recommend: defend PandaDoc, or steer to DocuSign/other? We produce
the comparison; note the current automation kit (T-0099) is built around PandaDoc —
switching vendors has rework cost worth surfacing in task B.
ENRICH (in-session): file two-surface brief(s), link T-0132/T-0133/T-0062/T-0095, set
Priorité=Moyenne / Domaine=Gestion de projet, → Non planifié. Split into tasks A + B (or
fold under the automation epic) per Yasser. TRACKING DEFERRED: no headless wrapper for
.tracked-cards.json — register next in-session sweep (stage=triage, rq_open=[]).
=== DRAFT CLIENT-SAFE ACK (FR) — post in-session AFTER Yasser rules; no commitment ===
🎩 Bien reçu, Marjorie — merci d'avoir consigné les deux bloquants suite à notre appel.
Nous les avons bien notés, pour appuyer votre demande d'approbation auprès de Stéphane :
1. Zoho Recruit — un dossier de justification (ROI) pour l'achat d'une licence dédiée, la
rotation d'utilisateurs Yasser ↔ Kurtis restant l'option de repli (non idéale).
2. Signatures électroniques — un dossier ROI pour PandaDoc, ou une recommandation d'un autre
prestataire (DocuSign ou équivalent), en tenant compte de l'intégration Zoho Recruit / Make.
Nous revenons vers vous avec un dossier pour chacun. Nous vous recontactons si une précision
devient nécessaire.
paste on the card, then hit Done here (or tell Alfred you sent it); the draft file is deleted on post
Pending your QA
20T-0124 · Aidelab QA OVERDUE 2026-07-15
PROCESS PAGE + WHY-US TEASER, built A-to-Z overnight (Robin, 07-15): both Claude Design deliverables implemented 1:1 into aidelab-theme, adapted to site system (fonts/azure/buttons win), FR+EN seeded via ACF, STAGING LIVE for the 10:45 QA…
aidelabstg.wpenginepowered.com aidelabstg.wpenginepowered.com aidelab-theme PR #3 process-page-build-2026-07-15.html
T-0122 · Personal QA OVERDUE 2026-07-15
WED 07-15 MEETING PREPS, all four ready, open each before the call: 9:00 Innoova Notion walkthrough w/ Marjorie file:///Users/yasser/.claude/clients/innoova/tasks/meeting-prep-notion-walkthrough-2026-07-15.html -> 13:00 Aidelab Fred…
meeting-prep-notion-walkthrough-2026-07-15.html design-iteration-dispatch-2026-07-15.html meeting-prep-homepage-retro-2026-07-15.html index.html
T-0116 · Unito QA
llms.txt from Martin's draft (Asana task: Martin attached an llm.txt draft + implementation.md). Goal per Yasser: use Martin's content but OVERWRITE/ENRICH Yoast SEO's auto-generated llms.txt (Unito runs Yoast, which ships…
llms-txt-2026-07-14.html mkt-website PR #2141
T-0115 · Unito QA due 2026-07-20
Nelio A/B feasibility vs Martin's 4 test ideas (Asana AB-tool task, Martin comments 07-10 + 07-13: '5k monthly should be ok' + tests: (1) form-hero vs dual-CTA hero on enterprise/on-demand connectors, (2) video blocks on…
nelio-feasibility-2026-07-14.html nelio-poc-tool-combo-2026-07-15.html
T-0097 · Unito QA OVERDUE 2026-07-15
CTA temperature bug FIXED + globally prevented (07-09). Root cause: cta-tracking.js derives temperature from the CTA's destination URL only; the combo-page 'Book a demo' button is a JS modal-trigger with no href, so it silently fell to the…
cta-temperature-combo-2026-07-09.html mkt-website PR #2138 sandbox unito-a4f103 cta-temp-prod-qa-2026-07-15.html
T-0095 · Innoova QA
Notion board build + status synthesis DONE (07-09): board built (standard 6-state schema, ENTIRELY IN FRENCH — francophone client, deliberate one-off), Triage column, French copy-paste template for Marjorie (not shared yet, Yasser's call),…
T-0091 · Unito QA
July sprint triage (07-09) — 3 of the 4 originally-escalated items now briefed by Yasser + dispatched: (1) Book-a-demo + secondary form submission monitor — simple synthetic check for now (broader render/a11y vision parked as T-0092).
sandbox unito-cf1faf tool-search-fix-2026-07-14.html tldr-repro-verdict-2026-07-14.html pr2140-staging-verification-2026-07-15.html
T-0089 · Personal QA
Spec + build a lean fix for the DG-laptop sync gap (Yasser, 07-09): Alfred state doesn't reach the DataGrail laptop (by design, T-0044 — thin DG-only profile, no yass-claude history for compliance reasons). Yasser's bar: within 30min of…
dg-command-bus-2026-07-09.html
T-0071 · BizDev QA OVERDUE 2026-07-07
Mastermind AI Workshop 07-20 — brief + full-fat Notion card SHIPPED (Robin 07-06): concept/thesis/both parts/tier-verdict(all-Pro-reproducible)/6 slide-picks + 2 live demos/ZIP closer/deck tooling + dated milestones Jul7→Jul20. Brief +…
T-0066 · Personal QA OVERDUE 2026-07-08
Daily routines RESEARCH+DESIGN DELIVERED 07-06 (Robin, zero infra built/loaded). MASTERMIND VALIDATION 16:20: Marlee's real setup = Claude+LinkNinja-MCP drafts w/ never-auto-send + 3x/wk triage routine — independently confirms our…
T-0065 · Content QA OVERDUE 2026-07-10
AuthoredUp evaluation — RECON COMPLETE 07-06 (Robin). Brief: Business/LinkedIn/authoredup-evaluation-2026-07-06.md (ys-business). Rec: TRIAL YES / Individual (=the 'Basic' single-user plan) $19.95mo, 14-day free trial no CC. Findings:…
T-0064 · SkyCloak QA
GEO ship follow-ups (LOW) QA-READY — branch feature/geo-followups-lows off main@3f3ba971, sandbox https://skycloak-d68c76.clowd.localhost:8443/ (running), 2 commits, NO PR (gated). (1) AI-allowlist = NO code: premise falsified — theme…
sandbox skycloak-d68c76 file:///Users/yasser/.claude/alfred/cont sandbox skycloak-ae8bce
T-0031 · Personal QA OVERDUE 2026-07-10
Webhook always-on relay (no VPS): CF Worker receives Notion+Asana webhooks, always 200s (never deactivated), enqueues to KV (free tier: 100k req/day, 1k KV writes/day — plenty); laptop drains queue on wake + every 15min + session start →…
T-0045 · Content QA OVERDUE 2026-07-06
yassman prod pipeline (Robin): SHIPPED 07-06 — Mon pillar LIVE https://yassersoliman.com/blog/technical-seo-b2b-saas/ (2989), Wed 2990 + Fri 2991 scheduled future 8AM EDT (cron verified 12:00 UTC), 5 inbound links applied, housekeeping…
yassersoliman.com yassman PR #1
T-0049 · Unito QA
FAQPage schema Phase 1 QA-READY 07-06 (Robin): top-10 connectors (Jira/Trello/Asana/monday/Notion/Sheets/ClickUp/Airtable/Salesforce/HubSpot, proxy-ranked — GSC unreachable) + v2 integration pages w/ existing FAQs emit schema; one-source…
sandbox unito-e99683 mkt-website PR #2137 faq-schema-prod-qa-2026-07-10.html Asana task
T-0080 · ChefJasper QA due 2026-10-01
FLAGSHIP WebOps X-Ray deliverable for Alison Robins (prospect; $1.5-3k→ladder to 5k fractional-Head-of-WebOps). BOARD CREATED 07-08 (Chef Jasper Tasks, under Soliman Digital Inc). 6 Agile epics; Phase-1 research dispatched 07-08…
T-0100 · Personal QA OVERDUE 2026-07-11
POLLER v2 — full coverage + reliability (Yasser 07-09 eve: 'make sure we're fully polling ALL of my clients' Notion boards and Asana projects to figure out where we're at, regularly'). Absorbs T-0086's coverage gap + tonight's root-cause…
poller-v2-report-2026-07-09.html
T-0123 · Unito QA OVERDUE 2026-07-15
Sprint grouping analysis for the 10:45 review (overnight Robin, ANALYSIS ONLY): can the 4 active-sprint tasks be one combined PR? VERDICT: TWO PRs, both already built + verified on pushed branches. PR 1 = tool combo canonical fix (task…
sprint-grouping-2026-07-15.html mkt-website PR #2140 sprint-qa-runbook-2026-07-15.html mkt-website PR #2141
T-0133 · Innoova QA
Accès équipe SDI - logins Zoho Recruit/PandaDoc/CRM (suivi appel Marjorie 07-15); Yasser: screenshot Zoho admin-approval → Marjorie + email Laura Candido (EN, cc Laurent+Naomi) for CRM
T-0134 · aidelab QA
Process page: review corrections (Phase 4 micron 35-50 + Phase 3 cleanup)
Tier 3 - your hands only
5T-0125 · Personal YOUR HANDS OVERDUE 2026-07-15
TASK-STATE CONSISTENCY SWEEP + system fix (Yasser 07-15 ~00:30: our T-#### lines, Notion/Asana cards, review.html, reports and calendar are drifting out of sync — up to date in one surface, stale in another, getting confusing). (1)…
T-0094 · WorkJam YOUR HANDS
2 client-reported items (07-09): (1) Mia — News-post clone editor bug, root-caused (admin_head builder-disable CSS missing the news exemption), fixed, QA-passed as PR #39. Yasser authorized prod deploy live (07-09 evening) — Robin…
robin-2026-07-09-newsroom-deploy-and-fr-hero.html pr40-prod-deploy-2026-07-10.html
T-0081 · Personal YOUR HANDS OVERDUE 2026-07-11
Optimize Claude Code cache usage + context hygiene to stretch the Max sub. Insight (Yasser, 2026-07-08): most token spend is CACHE READ, meaning long-lived conversations re-read a growing context every turn. Levers to investigate and build…
file:///Users/yasser/.claude/reference/c
T-0026 · Personal YOUR HANDS
Triage poller: launchd script polls Notion+Asana triage columns + comments every ~5min (cursor state) → event files in alfred/state/inbox/ + macOS notification + headless 'claude -p /intake triage' grill run; UserPromptSubmit hook whispers…
T-0099 · Innoova YOUR HANDS
Teams-transcript automation BUILD SESSION 07-08 late night (Yasser solo, parsed from an unclaimed meeting event during the 07-09 catch-up EOD — same poller-coverage gap as T-0098). This is the technical guts of the 'Team AI' epic flow…
make-m365-prototype-kit-2026-07-10.html
Agents - in flight
26 running| Agent | Client | Task | Size | Elapsed | Status | Actions |
|---|---|---|---|---|---|---|
| dispatch | Croak | WoodRunner Games 'The Witch's Feast' landing-page updates… | M | - | running | - |
| dispatch | Personal | MAKE ALL AGENTS ACTUAL AGENTS + always-on fleet (from the… | L | - | running | - |
| dispatch | WorkJam | ROI CALCULATOR re-examination (Yasser 07-15, Notion… | M | - | running | - |
| dispatch | Personal | GORDON — the unbiased QA agent + 100%-trust QA framework… | L | - | running | - |
| dispatch | Personal | AGENTIC-OS EVOLUTION — review.html v2 hub + event lifecycle… | L | - | running | - |
| dispatch | DataGrail | LAWSTRONAUT research (Yasser 07-14 eve): can… | M | - | running | - |
| dispatch | Aidelab | SLACK DEPLOY BOT (Yasser 07-14): existing Alfred Slack bot… | M | - | running | - |
| dispatch | DataGrail | Solution-pages migration to Solutions V2 — client-promised… | L | - | running | - |
| dispatch | DataGrail | Updated SoW — SCOPE ALREADY CONFIRMED at Mon 07-13 13:01… | S | - | running | - |
| dispatch | Personal | TIME-BLOCK SYSTEM (Yasser 07-12 late night, high… | M | - | running | - |
| dispatch | WorkJam | Full board status audit dispatched (07-09, Yasser confused… | M | - | running | - |
| dispatch | Personal | WEEKEND RETROSPECTIVE — level up the Alfred/Robin system… | L | - | running | - |
| dispatch | DataGrail | Compliance-data project: KICK OFF BUILD — 3-4wk beta clock… | L | - | running | - |
| dispatch | Personal | ROUTINE OPTIMIZATION BRAINSTORM (enriched 07-06, absorbs… | M | - | running | - |
| dispatch | Personal | Sunday week-planning ritual = pilot A: Alfred ritual… | L | - | running | - |
| dispatch | Personal | Codify /robin v0 dispatch skill (grill → plan+adversarial… | L | - | running | - |
| dispatch | Personal | Digest surface: every headless run appends structured event… | M | - | running | - |
| dispatch | SkyCloak | SkyCloak live-client pilot: create SkyCloak Notion board… | M | - | running | - |
| dispatch | Personal | Mobile-QA capability for Robin dispatches [renumbered from… | M | - | running | - |
| dispatch | Personal | SESSION AGENDA when Yasser back from his run (eve… | M | - | running | - |
| dispatch | Personal | PLAN TOMORROW 2026-07-09 as a 0-MEETING 8h FOCUS SPRINT —… | M | - | running | - |
| dispatch | Aidelab | AIDELAB infra setup (Yasser 07-10): (A) onboard… | L | - | running | - |
| dispatch | AvantagePlus | AvP CI/CD PIPELINE (Yasser ruling 07-10, supersedes one-off… | L | - | running | - |
| dispatch | Personal | WP CI/CD PIPELINE PLAYBOOK (Yasser 07-10: 4th pipeline… | M | - | running | - |
| dispatch | Personal | CROSS-LAPTOP OPS CHANNEL — research+design (Yasser 07-09… | M | - | running | - |
| dispatch | SolimanDigital | Post-VPS: private escalation channel (DECISIONS to phone,… | M | - | running | - |
Task ledger
120 active tasks| Task | Client | Status | Who | Due | Age |
|---|---|---|---|---|---|
| T-0106 | Aidelab | next | — | - | 7d |
| T-0114 | Aidelab | next | — | - | 3d |
| T-0124 | Aidelab | next | Yasser | 2026-07-15 | 2d |
| T-0135 | Aidelab | next | — | 2026-07-17 | 28h |
| T-0088 | Avantageplus | next | — | - | 9d |
| T-0098 | Avantageplus | next | — | - | 8d |
| T-0104 | Avantageplus | next | — | - | 7d |
| T-0009 | BizDev | next | — | - | 16d |
| T-0017 | BizDev | inbox | — | - | 16d |
| T-0018 | BizDev | next | — | - | 16d |
| T-0025 | BizDev | next | — | - | 13d |
| T-0034 | BizDev | next | — | - | 13d |
| T-0070 | BizDev | sched | — | 2026-07-12 | 11d |
| T-0071 | BizDev | waiting | Yasser | 2026-07-07 | 11d |
| T-0072 | BizDev | inbox | — | - | 11d |
| T-0073 | BizDev | inbox | — | - | 11d |
| T-0080 | Chefjasper | next | Yasser | 2026-10-01 | 10d |
| T-0042 | Clowdr | next | — | - | 12d |
| T-0003 | Content | sched | — | 2026-07-05 | 16d |
| T-0004 | Content | sched | — | 2026-07-05 | 16d |
| T-0005 | Content | next | — | 2026-07-06 | 16d |
| T-0013 | Content | next | — | - | 16d |
| T-0014 | Content | next | — | - | 16d |
| T-0015 | Content | next | — | - | 16d |
| T-0016 | Content | inbox | — | - | 16d |
| T-0020 | Content | next | — | - | 13d |
| T-0037 | Content | inbox | — | - | 13d |
| T-0038 | Content | sched | — | 2026-07-05 | 13d |
| T-0039 | Content | next | — | 2026-07-06 | 13d |
| T-0045 | Content | waiting | Yasser | 2026-07-06 | 11d |
| T-0051 | Content | next | — | 2026-07-08 | 11d |
| T-0052 | Content | next | — | - | 11d |
| T-0065 | Content | waiting | Yasser | 2026-07-10 | 11d |
| T-0139 | Croak | next | — | - | 8h |
| T-0001 | DataGrail | next | — | - | 16d |
| T-0002 | DataGrail | next | — | - | 16d |
| T-0012 | DataGrail | next | — | - | 16d |
| T-0044 | DataGrail | next | — | - | 11d |
| T-0056 | DataGrail | waiting | Amy | - | 11d |
| T-0058 | DataGrail | next | — | 2026-07-17 | 11d |
| T-0059 | DataGrail | waiting | Chris | - | 11d |
| T-0063 | DataGrail | inbox | — | - | 11d |
| T-0108 | DataGrail | next | — | 2026-07-16 | 3d |
| T-0109 | DataGrail | next | Chris | 2026-07-15 | 3d |
| T-0121 | DataGrail | next | Chris | 2026-07-15 | 3d |
| T-0061 | Innoova | waiting | Marjorie | 2026-07-08 | 11d |
| T-0062 | Innoova | next | — | 2026-07-10 | 11d |
| T-0095 | Innoova | next | Yasser | - | 8d |
| T-0099 | Innoova | next | Yasser | - | 8d |
| T-0132 | Innoova | waiting | Naomi/Marjorie | 2026-07-17 | 2d |
| T-0133 | Innoova | backlog | Yasser | - | 2d |
| T-0006 | Personal | sched | — | 2026-07-12 | 16d |
| T-0007 | Personal | next | — | - | 16d |
| T-0008 | Personal | next | — | - | 16d |
| T-0022 | Personal | sched | — | 2026-07-05 | 13d |
| T-0024 | Personal | next | — | 2026-07-05 | 13d |
| T-0026 | Personal | waiting | Yasser | - | 13d |
| T-0027 | Personal | next | — | 2026-07-06 | 13d |
| T-0028 | Personal | next | — | 2026-07-06 | 13d |
| T-0029 | Personal | next | — | 2026-07-08 | 13d |
| T-0030 | Personal | next | — | 2026-07-08 | 13d |
| T-0031 | Personal | waiting | Yasser | 2026-07-10 | 13d |
| T-0033 | Personal | next | — | 2026-07-07 | 13d |
| T-0035 | Personal | next | — | - | 13d |
| T-0036 | Personal | inbox | — | - | 13d |
| T-0057 | Personal | next | — | 2026-07-10 | 11d |
| T-0066 | Personal | waiting | Yasser | 2026-07-08 | 11d |
| T-0067 | Personal | next | — | 2026-07-08 | 11d |
| T-0068 | Personal | next | — | 2026-07-10 | 11d |
| T-0069 | Personal | next | — | - | 11d |
| T-0081 | Personal | next | Yasser | 2026-07-11 | 9d |
| T-0082 | Personal | next | — | - | 9d |
| T-0083 | Personal | next | — | 2026-07-08 | 9d |
| T-0084 | Personal | next | — | 2026-07-08 | 9d |
| T-0085 | Personal | next | — | 2026-07-08 | 9d |
| T-0087 | Personal | next | — | 2026-07-09 | 9d |
| T-0089 | Personal | next | Yasser | - | 8d |
| T-0090 | Personal | sched | — | 2026-07-12 | 8d |
| T-0100 | Personal | next | Yasser | 2026-07-11 | 8d |
| T-0101 | Personal | next | Robin | 2026-07-11 | 8d |
| T-0103 | Personal | sched | — | 2026-07-12 | 7d |
| T-0105 | Personal | next | — | - | 7d |
| T-0107 | Personal | sched | — | 2026-07-13 | 4d |
| T-0122 | Personal | sched | Yasser | 2026-07-15 | 3d |
| T-0125 | Personal | next | Yasser | 2026-07-15 | 2d |
| T-0126 | Personal | next | — | 2026-07-17 | 2d |
| T-0127 | Personal | next | — | 2026-07-18 | 2d |
| T-0138 | Personal | next | — | 2026-07-19 | 28h |
| T-0140 | Personal | inbox | — | - | 3h |
| T-0141 | Personal | inbox | — | - | 3h |
| T-0142 | Personal | inbox | — | - | 3h |
| T-0143 | Personal | inbox | — | - | 3h |
| T-0032 | Skycloak | next | — | 2026-07-11 | 13d |
| T-0064 | Skycloak | waiting | Yasser | - | 11d |
| T-0111 | Solimandigital | next | — | - | 3d |
| T-0112 | Solimandigital | sched | — | - | 3d |
| T-0113 | Solimandigital | sched | — | - | 3d |
| T-0117 | Solimandigital | next | — | - | 3d |
| T-0118 | Solimandigital | next | — | - | 3d |
| T-0119 | Solimandigital | sched | — | - | 3d |
| T-0120 | Solimandigital | sched | — | - | 3d |
| T-0049 | Unito | waiting | Yasser | - | 11d |
| T-0091 | Unito | next | Yasser | - | 8d |
| T-0092 | Unito | inbox | — | - | 8d |
| T-0097 | Unito | waiting | Yasser | 2026-07-15 | 8d |
| T-0110 | Unito | waiting | Martin | 2026-07-24 | 3d |
| T-0115 | Unito | next | Yasser | 2026-07-20 | 3d |
| T-0116 | Unito | next | Yasser | - | 3d |
| T-0123 | Unito | next | Yasser | 2026-07-15 | 2d |
| T-0136 | Unito | next | — | 2026-07-17 | 28h |
| T-0137 | Unito | next | — | 2026-07-17 | 28h |
| T-0128 | Woodrunner | waiting | Louis/Max | 2026-07-22 | 2d |
| T-0010 | WorkJam | next | — | - | 16d |
| T-0011 | WorkJam | next | — | - | 16d |
| T-0043 | WorkJam | waiting | Workjam-Admin | - | 12d |
| T-0050 | WorkJam | next | — | - | 11d |
| T-0094 | WorkJam | waiting | Yasser | - | 8d |
| T-0096 | WorkJam | next | — | - | 8d |
| T-0129 | WorkJam | next | Saj | 2026-07-17 | 2d |
| T-0134 | Aidelab | backlog | Yasser | - | 32h |
Boards - status roll-up (deep-links to Notion)
- workjam: Triage 2 · Unplanned 5 · Validate Plan 2 · Planned 1 · In Dev 2 · QA 6 · On Hold 3 · Done 12 · unknown 2 · (35 total)
- avantageplus: Backlog 4 · Unplanned 1 · In Dev 3 · QA 1 · Done 7 · (16 total)
- skycloak: Triage 1 · Unplanned 2 · Done 1 · (4 total)
- chefjasper: In Dev 1 · QA 5 · (6 total)
- innoova: Triage 2 · Réserve 2 · Non planifié 4 · Valider le plan 1 · Planifié 11 · En développement 1 · Terminé 7 · (28 total)
- aidelab: Not Started 14 · Planned 1 · In Dev 1 · In Progress 6 · QA 2 · Done 16 · (40 total)
- solimandigital: Unplanned 21 · Planned 5 · In Dev 2 · QA 1 · Done 6 · unknown 1 · (36 total)
- unito: ⏭️ Upcoming 4 · ✅ Done 44 · 🅿️ Parked for later 21 · 🏗️ Currently working on - July 11 · 📥 Inbox / to review 16 · (96 total)
Backlog: 62 task(s) not on a curated surface.
Velocity & audit
last 7 daysBy agent (last 7 days)
| Agent | Dispatches | Shipped | Blocked |
|---|---|---|---|
| Minion | 7 | 7 | 0 |
| Robin | 5 | 5 | 0 |
| Gordon | 4 | 4 | 0 |
| Vale | 3 | 3 | 0 |
By client (last 7 days)
| Client | Dispatches | Shipped |
|---|---|---|
| WorkJam | 8 | 8 |
| BizDev | 6 | 6 |
| Unito | 2 | 2 |
| DataGrail | 1 | 1 |
| Croak | 1 | 1 |
| Innoova | 1 | 1 |
Shipped today
2- T-0130 · Innoova · KURTIS PHASE 2 brief validation (Marjorie ask 07-14 eve, FR email + attached brief): Kurtis McPherson = Zoho Administrator, 8h/week, Phase 2 = Zoho technical…
- T-0086 · Personal · POLLER COVERAGE GAP (Yasser 07-08) — RESOLVED BY T-0100 (07-09): poller v3 now watches every column of all 8 boards…
Audit - unpromoted signals (6 machine decisions, 60 FYI)
Machine-sweep decisions 6
Raw ruling lines the headless sweeps flagged. Promote real ones into queue.md; they are not decisions until structured.
- [07-15 17:18] dg-bus · BLOCKED c0016 (T-0058) needs Yasser: **Job 1 (immediate status) — DONE.** Heartbeat line emitted and pushed; the main Mac now has a live picture. **Standing rule — ADOPTED** into CLAUDE.md (survives `/clear`): every DG session, bus or manual, heartbeats to `activity/dg.log` per the README convention. · github.com
- [07-16 12:55] dg-bus · BLOCKED c0030 (T-0058) needs Yasser: # c0030 PARKED — staging deploy of regs-hub · github.com
- [07-17 09:00] triage-draft · Innoova "Blockages": REAL request (not the pinned template — 08:50 sweep mis-skipped it; Marjorie duplicated+filled the 📌 model). 2 Yasser decisions: D1 Zoho Recruit dedicated-license ROI-case vs Yasser↔Kurtis rotation; D2 e-sig PandaDoc vs DocuSign. Zero client [RQ] (card complete, ball on our side). Ready to enrich in-session (link T-0132/T-0133/T-0062/T-0095, → Non planifié); .tracked-cards registration DEFERRED. · draft: ~/.claude/alfred/state/inbox/drafts/Notion page.md · Notion page
- [07-17 12:13] meeting · "ROI Calc. Sync" (Saj/Mia/Yasser) → enriched WorkJam ROI Calculator card (On Hold); direction CONFIRMED: public WP version gated + NO PDF export (matches PR #43 as built), PDF stays on Saj-owned internal Lovable track, repeatability de-prioritized (Mia). No new card/pointer — already tracked by T-0129. Reinforces open go-live blockers: Pardot form-handler URL + customer-stat clearance (M&S/Ulta/Panda/Venetian). Card is stale at On Hold given PR #43 is built — reactivate to Planned & dispatch? · card Notion page · meeting Notion page · T-0129
- [07-17 17:10] triage-draft · Unito (Asana) "Plan Asana badge on LPs": Asana connector could NOT read task (get_task → "no access"; get_me perm-gated) — drafted 3 scope questions BLIND from the card title only. Pre-post re-fetch REQUIRED: an in-session run with working Asana auth must re-read the card (it may already answer these) before posting. Not tracked (.tracked-cards.json asana:[] — deferred, no headless wrapper). · draft: ~/.claude/alfred/state/inbox/drafts/1216432532548453.md · Asana task
- [07-17 19:21] meeting · "Agentic-workforce architecture (07-17 7:15 PM voice memo)" → 4 created on Soliman Digital Backlog (Area: WebOps-AI Platform), all need in-session review: (1) Agent-activity logging system Notion page ; (2) Agent Builder meta-agent (weekly log analysis → scope-drift + new-agent proposals) Notion page ; (3) Copywriter/content-operator agent for blog+LinkedIn Notion page ; (4) Oracle research-accumulation Notion page . Pointers T-0140..T-0143 (inbox). Architecture decisions captured on the Agent Builder card: minions = disposable general-purpose workers Alfred dispatches, stay unnamed for now (Batman-themed if ever named); comms agent deferred (general agents suffice, do not over-engineer). 0 waiting-for. Meeting: Notion page
Digest FYI (unreviewed) 60
- [07-15 00:40] resolved · The two 00:07/00:50 "LLM.txt" access-DENIED DECISIONS are RETIRED: headless triage could not read the card (correct per the Asana-MCP-is-DG-only rule), but the task was already fully implemented that same night from Martin's real card attachments via fetch-asana-project.py (draft PR #2141, content sha256-verified, see T-0116/T-0123). The drafted scope questions [RQ-576885] are moot and must NOT be posted; draft file marked RETIRED.
- [07-13 12:02] meeting · "@Today 11:57 AM" (Innoova touchpoint fragment, ~2-min, empty notes) → no tasks created; 1 waiting-for: Marjorie (Innoova) to send her candidate-comms templates (RH interview / rejection / invitation + LinkedIn contact) → source material for Courriels-candidats epic · Notion page
- [07-13 13:01] meeting · "@Today 1:00 PM (EDT)" → empty page (no notes/transcript/action items), scheduling fragment, skipped · Notion page
- [07-13 13:07] meeting · "@Today 1:01 PM (EDT)" → client check-in fragment, empty notes; transcript = weekend small-talk + a business exchange. Substance: client says the demo page "looks great"; redefining the success metric from form-fills to meetings actually booked+showed (notes 30-40% of past inbound meeting-requests never converted); inbound slightly lower but judging on meetings booked. No action item assigned to us → no task created. Client NOT named in transcript (US attendee, family in Rhode Island; demo-page/booking-funnel account) — confirm who at review. · Notion page
- [07-13 13:33] meeting · "CiteMind - Demo" empty (no notes/no transcript — meeting just created/not yet recorded); skipped, nothing filed · Notion page
- [07-15 00:07] board · Aidelab: 3 board events — AL-40 'Homepage lean Why-us teaser' (created→Planned), AL-39 'Process page full scroll-story' (Unplanned→Planned), AL-41 'Design polish: SVG/animation fixes' (created→Planned). All Owner=Yasser, already at Planned with full self-authored briefs from the 07-07 review / 07-14 meeting — NOT client Triage cards, no grill/draft/board-write needed. FYI: the Process-page epic is planned & ready for dispatch when scheduled. · Notion page · Notion page · Notion page
- [07-15 09:07] meeting · "Innoova | Notion" → SKIPPED: transcript is opening chit-chat only (greetings + "Notion board is overwhelming, I'll share my screen"), no action items/tasks/decisions to extract. Notion-walkthrough session, recording caught only the intro. Filed nothing. · Notion page
- [07-15 10:37] dg-bus · result c0004 (T-0105) done: CI/CD pipeline for the DataGrail marketing site documented straight from the actual repo config (`~/dev/dg-website`). Re · github.com
- [07-15 10:42] dg-bus · result c0005 (T-0108) done: Read-only inventory of the solution-pages migration to the Solutions V2 template. No writes, no deploys, no env leased. · github.com
- [07-15 10:52] dg-bus · result c0007 (—) done: PR #8 progressed to review-ready. Scope: **Build Pipeline Modernization** (P0) — committed Webpack 5 + dart-sass build · github.com
- [07-15 10:57] dg-bus · result c0006 (—) done: PR #7 progressed to review-ready. Scope: **Plugin Hygiene & Dead-Code Cleanup** (P1). Branch `chore/plugin-hygiene`, bas · github.com
- [07-15 11:07] dg-bus · result c0008 (—) done: PR #9 progressed to review-ready. Scope: **Re-home solution-v2 prototype + gating ACF fields**. Branch `chore/solution-v · github.com
- [07-15 11:07] dg-bus · result c0009 (—) done: PR #10 progressed to review-ready. Scope: **front-end performance sweep** (self-host jQuery, next-gen WebP hero images, · github.com
- [07-15 11:07] dg-bus · result c0011 (T-0058) done: Privacy-hub frontend gap analysis (read/analyze only — nothing built or leased). Deliverable: a brief-ready dispatch b · github.com
- [07-15 11:12] dg-bus · result c0010 (T-0058) done: Privacy-hub regulation engine: **California proved out end-to-end for both laws**, deterministically and locally. Engine · github.com
- [07-15 11:27] dg-bus · result c0013 (T-0058) done: Privacy-hub reviewer backend: **BUILT + local QA PASS, deploy-ready, not deployed.** New workspace package `@privacy-hub · github.com
- [07-15 11:42] dg-bus · result c0014 (—) done: Enriched PR #9 (Solutions V2). **STEP 1 delivered and shipped to the draft PR; STEP 2 cleanly parked on Yasser's design · github.com
- [07-15 12:57] dg-bus · result c0015 (T-0058) done: Built the privacy-hub **enforcement & lawsuits feed** end-to-end in the `datagrail` WordPress theme, per the c0012 spec + Yasser's Option A ruling (official sources only; GDELT off; CourtListener deferred to phase 2). Local QA passes on all surfaces. No staging/prod. Verdict: **PASS**. · github.com
- [07-15 14:33] meeting · "Website Homepage Retro" (Soliman Digital internal) swept: AI notes/summary block still EMPTY (not yet generated), transcript captured only ~2min of intro small-talk + retro-structure setup, ZERO action items — filed nothing to any board. RE-CHECK in-session once Notion AI finishes the summary; the substantive what-worked / what-changed discussion was not recorded yet. · Notion page
- [07-15 17:54] meeting · "@Today 5:51 PM" → SKIPPED: noise fragment, empty notes + 3-line transcript about a broken Chrome, no action items / no client · filed nothing · Notion page
- [07-15 18:18] dg-bus · result c0017 (T-0058) done: Architecture decision + build plan. Design-only, read-only honored (no env, no code, no ADR edits, no deploy). · github.com
- [07-15 19:08] dg-bus · result c0018 (T-0058) done: MVP Phase 1 complete. **California is mined into the REAL engine through the real extraction path (no fixtures), and the gates held.** Nothing cleared, nothing fabricated. · github.com
- [07-15 19:53] dg-bus · result c0019 (T-0058) done: MVP Phase 3 complete. All 3 brief items built. **Local only, nothing deployed.** The pipeline is visible end to end. · github.com
- [07-15 20:27] meeting · "@Today 8:26 PM" → SKIPPED: noise fragment (brief informal check-in, no structured content; lone "invite Anas" item is call logistics already self-resolved in-transcript). Filed nothing. · Notion page
- [07-15 20:42] meeting · "Session Entra/Zoho Recruit 20h40" (Innoova) → 1 enriched Innoova Réserve: "Accès équipe SDI" (Notion page) — live troubleshooting reproduced the Zoho Recruit admin-consent blocker + confirmed Application Admin cannot self-consent; Jorge-Cruz-already-has-the-app lead noted (to confirm). No new card (would dup T-0133); pointer already filed. · Notion page
- [07-15 22:03] dg-bus · result c0020 (T-0108) done: **PASS. Xcode works end to end on this laptop for iOS-simulator QA.** No setup gap, nothing needed from Yasser. · github.com
- [07-15 23:18] dg-bus · result c0022 (T-0058) done: California re-mined on the **2026 regulations edition**. Source adoption clean, ADMT now extracts, and the new source exposed four real engine bugs that were arguably worth more than the refresh itself. · github.com
- [07-16 04:29] dg-bus · result c0024 (T-0058) done: Overnight closed-loop integration + Gordon stakeholder-acceptance e2e. **The whole privacy-hub now renders end to end locally, the map populates, and the e2e runs CLEAN with zero defect blockers.** Local only, nothing merged, nothing deployed, queue intact. · github.com
- [07-16 08:04] dg-bus · result c0021 (T-0108) done: Solutions V2 overnight pipeline complete: 10 modules built + 15 pages migrated, each independently Gordon-verified. **Draft PRs only, nothing merged or deployed.** 43 agents, ~34.9h agent-wall-clock compressed into the overnight window. · github.com
- [07-16 12:25] dg-bus · result c0026 (T-0058) done: # c0026 result — handoff-decision answers (T-0058) · github.com
- [07-16 12:45] dg-bus · result c0028 (T-0058) done: # c0028 result — attribution/UTM breakage diagnosis (read-only) · github.com
- [07-16 13:15] dg-bus · result c0025 (T-0108) done: # c0025 result — sv2 closed-loop QA-fix controller (T-0108) · github.com
- [07-16 13:30] dg-bus · result c0029 (T-0058) done: # c0029 result — dgconsent access gate (force-login + noindex delivered; OAuth step SUPERSEDED by c0033) · github.com
- [07-16 13:50] dg-bus · result c0033 (T-0058) done: # c0033 result — dgconsent access: OAuth dropped, @datagrail.io WP-login restriction (T-0058) · github.com
- [07-16 13:55] dg-bus · result c0032 (T-0058) done: # c0032 result — regs-hub STAGING deploy (resolves the c0030 park) (T-0058) · github.com
- [07-16 14:03] meeting · "A/B test @Today 2:00 PM" → SKIPPED: noise/test fragment (empty notes; transcript is pure social small talk — birthday/weather/weekend chit-chat, no action items or client work). Filed nothing. · Notion page
- [07-16 14:05] dg-bus · result c0031 (T-0058) done: # c0031 result — GTM container on dgconsent (T-0058) · github.com
- [07-16 14:40] meeting · "Aidelab | Fred & Yass" → 1 created AideLab Backlog (Phase 4 micron 20-35→35-50 + Phase 3 remove Alternative/bullets); links to AL-39 (at QA, not reopened) · Notion page · Notion page
- [07-16 16:31] dg-bus · result c0034 (T-0058) done: # c0034 — regs-hub state population (WAVE 1 done; WAVE 2 dispatched) · github.com
- [07-16 18:31] dg-bus · result c0035 (T-0058) done: # c0035 — regs-hub 1:1 fidelity + agent-as-Kendall (partial; 5 asks) · github.com
- [07-16 23:02] dg-bus · result c0036 (T-0058) done: # c0036 — Kendall demo prep + extraction cost (DONE) · github.com
- [07-17 01:17] dg-bus · result c0037 (T-0058) done: # c0037 — regs-hub fidelity rework + enforcement entry page (DONE, deployed, verified) · github.com
- [07-17 02:17] dg-bus · result c0038 (T-0058) done: # c0038 — regs-hub round-3 (Vale defects): DONE, deployed, re-verified on LIVE SERVED pages · github.com
- [07-17 08:50] notion-triage · Innoova "📌 MODÈLE - Comment soumettre une demande": pinned SOP/template card (📌) — skipped per pinned-card rule, no action · Notion page
- [07-17 08:50] notion-triage · Innoova "📌 Blockages": pinned card (📌) whose body is the verbatim submission template with fields UNFILLED (only 'Titre: blockage' typed) — skipped as pinned/SOP, but a client may have duplicated/edited the pinned template; worth an in-session glance to confirm it isn't a real request being attempted · Notion page
- [07-17 09:03] triage-draft · Innoova "Blockages - ZOHO & PANDADOC": newer 09:02 upsert (client edited card 3x) folded into the SAME draft — full content now confirms BOTH blockers are ROI/business-case deliverables for Stéphane spend-approval (Zoho license vs rotation; PandaDoc ROI or alt e-sig provider). Draft refined; DECISIONS line above still current. · Notion page
- [07-17 09:04] triage-draft sweep · queue note: 38 non-triage events linger in events/ (33 dg-bus result.done c0004–c0038, 5 board card.created/status_changed innoova+aidelab) — NOT triage-sweep event types, all already reflected in digest/narrative or handled by prior meeting-sweeps (T-0133 Accès-équipe + aidelab Phase-4 cards already created). Left in place (out of this kick’s mandate + 3 dg-bus have only indirect digest refs: c0012 resolved-line, c0016 heartbeat, c0030 superseded by c0032). Safe to bulk-ack to processed/ at in-session review.
- [07-17 11:29] dg-bus · result c0040 (T-0058) done: # c0040 — Book-a-Demo page performance numbers (for Chris report) · github.com
- [07-17 11:44] dg-bus · result c0039 (T-0058) done: # c0039 — regs-hub round-4: all 4 interaction/render fixes DONE + verified live · github.com
- [07-17 11:44] dg-bus · result c0041 (T-0058) done: # c0041 — UTM/attribution: reproduced, fixed in dev, awaiting staging go · github.com
- [07-17 11:52] meeting · DataGrail "Book-a-Demo readout (Chris)" → 0 cards (client has NO Notion board; dg-ops-bus + local handoffs only); DECISION logged to datagrail/task-log.md: hold + monitor current Book-a-Demo flow through end-of-August (week-2 dip discounted — smallest-sample + peak US travel weeks); 1 PARKED hypothesis (invert funnel: short form → calendar, instead of calendar-first) awaiting Yasser queue-vs-hold; waiting-for: next perf report (Chris) gates the Aug eval · Notion page
- [07-17 12:13] meeting · waiting-for: Saj to build the internal BDR version in Lovable with PDF export (separate track, out of our WP scope) · ref Notion page
- [07-17 12:14] dg-bus · result c0043 (T-0058) done: # c0043 — GA4 headed capture + session-drop investigation: DONE · github.com
- [07-17 12:24] dg-bus · result c0042 (T-0058) done: # c0042 — solutions-v2 consolidate → Gordon QA → STAGING: DONE · github.com
- [07-17 12:31] meeting · WorkJam RevOps/marketing ("@Today 12:26 PM") swept: AI notes/summary block EMPTY (not yet generated — meeting live), transcript partial ~3min. Substance: can the ROI-calculator form inputs be captured via Pardot and PAIRED with the gate-page name+email to attribute to one Salesforce customer record? Open sub-q raised in-room: calculator form currently asks NO email, so a linking mechanism (cookie/Pardot cross-page tracking, or a light identity handoff) is needed since customer records key on email; client to run Pardot test cases. Ties to existing WorkJam ROI-calculator build (clients/workjam/roi-calculator/) + gads-pardot-tracking-investigation-2026-07-08. Attendees incl. Saj (WorkJam). Filed NOTHING to any board (partial+unattributed action items). RE-CHECK in-session once Notion AI finishes summary+action items, then route to WorkJam board. · Notion page
- [07-17 13:24] dg-bus · result c0044 (T-0058) done: # c0044 — sv2 staging RUCSS fix (completes c0042 deploy): DONE — PASS · github.com
- [07-17 13:54] dg-bus · result c0045 (T-0058) done: # c0045 — sv2 prod-vs-v2 parity review (15 pages): DONE · github.com
- [07-17 14:03] meeting · "Agentic workflows chat w/ Chris" → SKIP: empty page (no notes, no transcript, no action items — notes-page auto-created at scheduled 2:00 PM start, no content captured). Nothing filed. · Notion page
- [07-17 14:45] meeting · "Réunion 17 juil. 14:39" (Innoova · notes vides, transcription seule) → 1 enriched, 0 created, 0 waiting-for · Zoho OAuth Self-Client card left Planifié (Status unchanged), appended session provenance: console dév Zoho, app « Nova TR automation », Self-Client vs Server-based (URI de redirection Make → penche Server-based), étape Client ID/Secret; à confirmer le type retenu · card Notion page · meeting Notion page
- [07-17 17:11] triage-draft sweep · bulk-acked 45 non-triage events → processed/ (40 dg-bus result.done/blocked c0004–c0045 — all already have digest lines incl. c0030 resolved-by-c0032, c0012 planned handoff, c0016 heartbeat; 5 board — 2 card.created already created by prior meeting-sweeps [aidelab Phase-4, innoova Accès-équipe], 3 innoova status_changed→Terminé stale FYI). Queue cleared. No triage/comment event types among them; nothing drafted for these.
Waiting on others
7 awaiting7 item(s) waiting on 7 people - expand
Amy WAITING
- T-0056 · DataGrail · Compliance Data Project SOW ($4k fixed + $1k election-only incentive, net-30, outside the $5k retainer) — SENT TO AMY FOR SIGNATURE 2026-07-08 (Yasser).… Marked done - handled manually, outside the system. Clears permanently when you paste the copied phrase into Alfred; nothing is saved until then.Deferred. Paste the copied phrase into Alfred to push it; nothing is saved until then.
Chris WAITING
- T-0059 · DataGrail · Comp confirmation: Chris to follow up w/ Amy on the $4k + $1k structure (delayed by Jul-4 short week; verbal agreement in 07-06 meeting) Marked done - handled manually, outside the system. Clears permanently when you paste the copied phrase into Alfred; nothing is saved until then.Deferred. Paste the copied phrase into Alfred to push it; nothing is saved until then.
Louis/Max WAITING
- T-0128 · WoodRunner · CROAK KICKSTARTER PRE-LAUNCH LANDING PAGE (Louis, WoodRunner Games, 07-15, French message): KS launches MI-AOUT; they'll run Meta ads to a dedicated Croak LP… Marked done - handled manually, outside the system. Clears permanently when you paste the copied phrase into Alfred; nothing is saved until then.Deferred. Paste the copied phrase into Alfred to push it; nothing is saved until then.
Marjorie WAITING
- T-0061 · Innoova · Marjorie deliverables: Zoho job-posting/requisition flow video (24-48h promise) + her bio; watch/process video on arrival Marked done - handled manually, outside the system. Clears permanently when you paste the copied phrase into Alfred; nothing is saved until then.Deferred. Paste the copied phrase into Alfred to push it; nothing is saved until then.
Martin WAITING
- T-0110 · Unito · Next Martin 1:1/biweekly AGENDA (from 07-14 inbox triage, report file:///Users/yasser/.claude/clients/unito/tasks/inbox-triage-2026-07-14.html): (1) Asana… inbox-triage-2026-07-14b.html noncanonical-archival-plan-2026-07-15.htmlMarked done - handled manually, outside the system. Clears permanently when you paste the copied phrase into Alfred; nothing is saved until then.Deferred. Paste the copied phrase into Alfred to push it; nothing is saved until then.
Naomi/Marjorie WAITING
- T-0132 · Innoova · ACCESS ASKS for the automation build (Yasser 07-15 eve). Emails DRAFTED (Yasser reviews+sends): (1) NAOMI (EN,… file:///Users/yasser/.claude/clients/inn transcript-test-report-2026-07-15.htmlMarked done - handled manually, outside the system. Clears permanently when you paste the copied phrase into Alfred; nothing is saved until then.Deferred. Paste the copied phrase into Alfred to push it; nothing is saved until then.
WorkJam-admin WAITING
- T-0043 · WorkJam · Newsroom uniformity — DELIVERED; Slack delivery note + Kinsta key ask SENT 07-06 AM; residual: key rotation (WorkJam admin), clone spot-check + demo recording… Marked done - handled manually, outside the system. Clears permanently when you paste the copied phrase into Alfred; nothing is saved until then.Deferred. Paste the copied phrase into Alfred to push it; nothing is saved until then.
System health
Background processes
Inbox pulse OLDEST 4h · STUCK
Pending 22 · claimed 0 · processed 137
Oldest pending: 4h (board-datagrail-a-b-test-form-first-book-a-dem) · by source: board 22
Recent sweeps last 8
- [07-17 19:19] meeting · 5 pending ok · 678s
- [07-17 17:06] triage · 46 pending ok · 306s
- [07-17 14:44] meeting · 46 pending ok · 468s
- [07-17 14:03] meeting · 46 pending ok · 86s
- [07-17 12:26] meeting · 44 pending ok · 317s
- [07-17 12:06] meeting · 42 pending ok · 463s
- [07-17 11:45] meeting · 42 pending ok · 461s
- [07-17 08:57] triage · 39 pending ok · 541s
"pending" = event files present when the sweep launched.
What the sweeps produced
Drafts awaiting one-tap send: 2 - see the Approvals surface.
Sweep-authored digest lines (last 24h): 24
- [07-17 09:00] triage-draft · Innoova "Blockages": REAL request (not the pinned template — 08:50 sweep mis-skipped it; Marjorie duplicated+filled the 📌 model). 2 Yasser decisions: D1 Zoho Recruit dedicated-license ROI-case vs Yasser↔Kurtis rotation; D2 e-sig PandaDoc vs DocuSign. Zero client [RQ] (card complete, ball on our side). Ready to enrich in-session (link T-0132/T-0133/T-0062/T-0095, → Non planifié); .tracked-cards registration DEFERRED. · draft: ~/.claude/alfred/state/inbox/drafts/Notion page.md · Notion page
- [07-17 12:13] meeting · "ROI Calc. Sync" (Saj/Mia/Yasser) → enriched WorkJam ROI Calculator card (On Hold); direction CONFIRMED: public WP version gated + NO PDF export (matches PR #43 as built), PDF stays on Saj-owned internal Lovable track, repeatability de-prioritized (Mia). No new card/pointer — already tracked by T-0129. Reinforces open go-live blockers: Pardot form-handler URL + customer-stat clearance (M&S/Ulta/Panda/Venetian). Card is stale at On Hold given PR #43 is built — reactivate to Planned & dispatch? · card Notion page · meeting Notion page · T-0129
- [07-17 17:10] triage-draft · Unito (Asana) "Plan Asana badge on LPs": Asana connector could NOT read task (get_task → "no access"; get_me perm-gated) — drafted 3 scope questions BLIND from the card title only. Pre-post re-fetch REQUIRED: an in-session run with working Asana auth must re-read the card (it may already answer these) before posting. Not tracked (.tracked-cards.json asana:[] — deferred, no headless wrapper). · draft: ~/.claude/alfred/state/inbox/drafts/1216432532548453.md · Asana task
- [07-17 19:21] meeting · "Agentic-workforce architecture (07-17 7:15 PM voice memo)" → 4 created on Soliman Digital Backlog (Area: WebOps-AI Platform), all need in-session review: (1) Agent-activity logging system Notion page ; (2) Agent Builder meta-agent (weekly log analysis → scope-drift + new-agent proposals) Notion page ; (3) Copywriter/content-operator agent for blog+LinkedIn Notion page ; (4) Oracle research-accumulation Notion page . Pointers T-0140..T-0143 (inbox). Architecture decisions captured on the Agent Builder card: minions = disposable general-purpose workers Alfred dispatches, stay unnamed for now (Batman-themed if ever named); comms agent deferred (general agents suffice, do not over-engineer). 0 waiting-for. Meeting: Notion page
- [07-16 23:02] dg-bus · result c0036 (T-0058) done: # c0036 — Kendall demo prep + extraction cost (DONE) · github.com
- [07-17 01:17] dg-bus · result c0037 (T-0058) done: # c0037 — regs-hub fidelity rework + enforcement entry page (DONE, deployed, verified) · github.com
- [07-17 02:17] dg-bus · result c0038 (T-0058) done: # c0038 — regs-hub round-3 (Vale defects): DONE, deployed, re-verified on LIVE SERVED pages · github.com
- [07-17 08:50] notion-triage · Innoova "📌 MODÈLE - Comment soumettre une demande": pinned SOP/template card (📌) — skipped per pinned-card rule, no action · Notion page
- [07-17 08:50] notion-triage · Innoova "📌 Blockages": pinned card (📌) whose body is the verbatim submission template with fields UNFILLED (only 'Titre: blockage' typed) — skipped as pinned/SOP, but a client may have duplicated/edited the pinned template; worth an in-session glance to confirm it isn't a real request being attempted · Notion page
- [07-17 09:03] triage-draft · Innoova "Blockages - ZOHO & PANDADOC": newer 09:02 upsert (client edited card 3x) folded into the SAME draft — full content now confirms BOTH blockers are ROI/business-case deliverables for Stéphane spend-approval (Zoho license vs rotation; PandaDoc ROI or alt e-sig provider). Draft refined; DECISIONS line above still current. · Notion page
- [07-17 09:04] triage-draft sweep · queue note: 38 non-triage events linger in events/ (33 dg-bus result.done c0004–c0038, 5 board card.created/status_changed innoova+aidelab) — NOT triage-sweep event types, all already reflected in digest/narrative or handled by prior meeting-sweeps (T-0133 Accès-équipe + aidelab Phase-4 cards already created). Left in place (out of this kick’s mandate + 3 dg-bus have only indirect digest refs: c0012 resolved-line, c0016 heartbeat, c0030 superseded by c0032). Safe to bulk-ack to processed/ at in-session review.
- [07-17 11:29] dg-bus · result c0040 (T-0058) done: # c0040 — Book-a-Demo page performance numbers (for Chris report) · github.com
- [07-17 11:44] dg-bus · result c0039 (T-0058) done: # c0039 — regs-hub round-4: all 4 interaction/render fixes DONE + verified live · github.com
- [07-17 11:44] dg-bus · result c0041 (T-0058) done: # c0041 — UTM/attribution: reproduced, fixed in dev, awaiting staging go · github.com
- [07-17 11:52] meeting · DataGrail "Book-a-Demo readout (Chris)" → 0 cards (client has NO Notion board; dg-ops-bus + local handoffs only); DECISION logged to datagrail/task-log.md: hold + monitor current Book-a-Demo flow through end-of-August (week-2 dip discounted — smallest-sample + peak US travel weeks); 1 PARKED hypothesis (invert funnel: short form → calendar, instead of calendar-first) awaiting Yasser queue-vs-hold; waiting-for: next perf report (Chris) gates the Aug eval · Notion page
- [07-17 12:13] meeting · waiting-for: Saj to build the internal BDR version in Lovable with PDF export (separate track, out of our WP scope) · ref Notion page
- [07-17 12:14] dg-bus · result c0043 (T-0058) done: # c0043 — GA4 headed capture + session-drop investigation: DONE · github.com
- [07-17 12:24] dg-bus · result c0042 (T-0058) done: # c0042 — solutions-v2 consolidate → Gordon QA → STAGING: DONE · github.com
- [07-17 12:31] meeting · WorkJam RevOps/marketing ("@Today 12:26 PM") swept: AI notes/summary block EMPTY (not yet generated — meeting live), transcript partial ~3min. Substance: can the ROI-calculator form inputs be captured via Pardot and PAIRED with the gate-page name+email to attribute to one Salesforce customer record? Open sub-q raised in-room: calculator form currently asks NO email, so a linking mechanism (cookie/Pardot cross-page tracking, or a light identity handoff) is needed since customer records key on email; client to run Pardot test cases. Ties to existing WorkJam ROI-calculator build (clients/workjam/roi-calculator/) + gads-pardot-tracking-investigation-2026-07-08. Attendees incl. Saj (WorkJam). Filed NOTHING to any board (partial+unattributed action items). RE-CHECK in-session once Notion AI finishes summary+action items, then route to WorkJam board. · Notion page
- [07-17 13:24] dg-bus · result c0044 (T-0058) done: # c0044 — sv2 staging RUCSS fix (completes c0042 deploy): DONE — PASS · github.com
- [07-17 13:54] dg-bus · result c0045 (T-0058) done: # c0045 — sv2 prod-vs-v2 parity review (15 pages): DONE · github.com
- [07-17 14:03] meeting · "Agentic workflows chat w/ Chris" → SKIP: empty page (no notes, no transcript, no action items — notes-page auto-created at scheduled 2:00 PM start, no content captured). Nothing filed. · Notion page
- [07-17 14:45] meeting · "Réunion 17 juil. 14:39" (Innoova · notes vides, transcription seule) → 1 enriched, 0 created, 0 waiting-for · Zoho OAuth Self-Client card left Planifié (Status unchanged), appended session provenance: console dév Zoho, app « Nova TR automation », Self-Client vs Server-based (URI de redirection Make → penche Server-based), étape Client ID/Secret; à confirmer le type retenu · card Notion page · meeting Notion page
- [07-17 17:11] triage-draft sweep · bulk-acked 45 non-triage events → processed/ (40 dg-bus result.done/blocked c0004–c0045 — all already have digest lines incl. c0030 resolved-by-c0032, c0012 planned handoff, c0016 heartbeat; 5 board — 2 card.created already created by prior meeting-sweeps [aidelab Phase-4, innoova Accès-équipe], 3 innoova status_changed→Terminé stale FYI). Queue cleared. No triage/comment event types among them; nothing drafted for these.
5 task(s) created today (triage-sweep + hand-filed together; tasks.md carries no author field).
Stuck / needs attention 18 FLAGGED
18 pending event(s) older than 2h:
- 4h ·
board-datagrail-a-b-test-form-first-book-a-dem - 4h ·
board-datagrail-monitor-demo-request-performan - 4h ·
board-archived-moved-to-asana-a-b-test-form-fi - 4h ·
board-archived-moved-to-asana-monitor-demo-req - 3h ·
board-dedicated-copywriter-content-operator-ag - 3h ·
board-agent-builder-meta-agent-weekly-log-anal - 3h ·
board-agent-activity-logging-system-concise-pe - 3h ·
board-oracle-persistent-research-accumulation- - +10 more
No watchdog alerts pending.